January 29, 2018 –
Description:
Verification of clear line-of-site between towers
Installation of microwave dishes at assigned AGL’s
Pathing of dishes to meet engineered RSL’s
Services:
Line of Site Study
Microwave Dish Installation
Microwave Dish Alignment